Gare de Lyon

Site Liberté

Paris La Défense
Neutral and residential buildings
Off-site timber, FOB, CLT
Work in progress

Rosny Métropolitain

Rosny-sous-bois
Housing, public facilities, shops
Mixt
competition

Flachat

Paris 17
Auditorium, offices and restaurant
Steel structure
Design development

Haxo Gambetta

Paris 20e
Rehabilitation and requalification of 363 housing units
re-use
Delivery in 2025

Tolbiac

Paris 13e
Restoration of a student residence
Wood, ceramic
Delivery in 2024

Gare de Lyon

Paris 12e
Construction of 136 housing units
Massive stone, wood, earth
Competition

Tower Batignolles

Paris 17e
Housing tower and services ZAC Clichy-Batignolles
Precast concrete
Delivered in 2018

Eugénie

Ferrières-en-Brie
Construction of intergenerational residence and shared spaces
prefabricated wooden panel
Delivery in 2023

Millerand Bagan

Ile de Nantes
Mixed use city block
Precast concrete
Ongoing project

Ney

Paris 18e
Construction of 72 housing units, nursery and shops
Clay brick
Delivered in 2020

Jean Lolive

Pantin
Construction of 79 housing units and services
Massive stones
Delivery in 2024

Tower Part-Dieu

Lyon
Mixt urban block : housings, chapel, offices, shops
Precast concrete
delivered in 2022

Rives de l'Ourcq

Bondy
Construction of 124 housing units and shops
Massive stones
Delivery in 2023

Vilgénis

Massy
Elderly residence
Precast concrete
Delivered in 2023

Volta

Paris 3e
Rehabilitation and construction of 13 housing units
Ceramic
Delivered in 2014

Manuguerra

Montpellier
Construction de 112 logements et locaux d'activité
raw earth, wood, straw
Competition

Roquepine

Paris 18e
Restructuring of an office building
massive stone
Delivery in 2024

Stendhal

Paris 20e
Restructuring and renovation of an office building
Grinding stone
Delivered in 2014

Epinettes

Paris 17e
Extensive restructuring of an autonomy residence
Reuse brick
Competition 2021

Charles Renard

Saint-Cyr l'Ecole
Off-site wooden housing
3D and 2D wooden off-site systems
Concours septembre 2023

Girondins

Lyon
Ensemble mixte logements et bureaux
Massive stone, wood, hemp concrete, FOB
on going project

Olympiades

Paris 13
Rénovation des tours Anvers et Londres
Metal cladding and plaster
Competition

Gare de Lyon

Paris 12e
Construction of 136 housing units
Massive stone, wood, earth
Competition
Street view
Massive stone facade
Wooden facade with hemp filling and earth plaster. Cantilever balconies.
Massive stone facade and winter garden over the garden
Wooden facade with hemp filling, earth plaster and winter garden over the garden
Axonometric view from the garden
Masterplan plots 2 and 7

Gare de Lyon

Description

Between the future public garden, the nearby green corridor, and Vincennes park, the operation is located at the crossroads of green corridors and benefits from direct access to nature, the key to a healthy living environment and the challenge of tomorrow.
The nearby railroad tracks are both a noise nuisance, which can be protected by audacious measures, and a fortunate situation insofar as it offers a clear horizon. Within the Messageries district (Tolila+Gilliland), which takes place on a railway wasteland, the two lots assert their filiation to the industrial heritage but in a post-carbon manner.
Lot 7 is in a front position, visible from the garden and the trains. In this context between nature and city, we ensure on the one hand a visual and landscape porosity and on the other hand an urban continuity along the street and the garden by aligning ourselves with the entire plot. We are well aware of the pivotal role of the project and make it an exemplary operation in all respects: urban, landscape, and constructive, a signal project! It is at the crossroads of emblematic roads, one urban and the other calm but structured. It is at the crossroads of eras, in a site that is transforming but rich in writing and materials that carry a certain heritage dimension. Finally, it is at the crossroads of thoughts. More than ever at the heart of current affairs, housing, and its qualities are the driving force behind living together, and we are demonstrating this here. Finally, architecture and the real estate industry are committed to a decarbonized world and propose alternatives to concrete.

Program

136 social housing units divided into 2 plots
Evolving common space and shops

Client

ICF Habitat la Sablière

Team

ITAR architectures - lot 7
MUZ - lot 2
Sibat
Atelier Nous
Barthes
Orféa
Atelier d'écologie urbaine
R-use

Surface

lot 7 : 5 200 m2 sp
lot 2 : 3 885 m2 sp