Girondins

Site Liberté

Paris La Défense
Neutral and residential buildings
Off-site timber, FOB, CLT
Work in progress

Rosny Métropolitain

Rosny-sous-bois
Housing, public facilities, shops
Mixt
competition

Flachat

Paris 17
Auditorium, offices and restaurant
Steel structure
Design development

Haxo Gambetta

Paris 20e
Rehabilitation and requalification of 363 housing units
re-use
Delivery in 2025

Tolbiac

Paris 13e
Restoration of a student residence
Wood, ceramic
Delivery in 2024

Gare de Lyon

Paris 12e
Construction of 136 housing units
Massive stone, wood, earth
Competition

Tower Batignolles

Paris 17e
Housing tower and services ZAC Clichy-Batignolles
Precast concrete
Delivered in 2018

Eugénie

Ferrières-en-Brie
Construction of intergenerational residence and shared spaces
prefabricated wooden panel
Delivery in 2023

Millerand Bagan

Ile de Nantes
Mixed use city block
Precast concrete
Ongoing project

Ney

Paris 18e
Construction of 72 housing units, nursery and shops
Clay brick
Delivered in 2020

Jean Lolive

Pantin
Construction of 79 housing units and services
Massive stones
Delivery in 2024

Tower Part-Dieu

Lyon
Mixt urban block : housings, chapel, offices, shops
Precast concrete
delivered in 2022

Rives de l'Ourcq

Bondy
Construction of 124 housing units and shops
Massive stones
Delivery in 2023

Vilgénis

Massy
Elderly residence
Precast concrete
Delivered in 2023

Volta

Paris 3e
Rehabilitation and construction of 13 housing units
Ceramic
Delivered in 2014

Manuguerra

Montpellier
Construction de 112 logements et locaux d'activité
raw earth, wood, straw
Competition

Roquepine

Paris 18e
Restructuring of an office building
massive stone
Delivery in 2024

Stendhal

Paris 20e
Restructuring and renovation of an office building
Grinding stone
Delivered in 2014

Epinettes

Paris 17e
Extensive restructuring of an autonomy residence
Reuse brick
Competition 2021

Charles Renard

Saint-Cyr l'Ecole
Off-site wooden housing
3D and 2D wooden off-site systems
Concours septembre 2023

Girondins

Lyon
Ensemble mixte logements et bureaux
Massive stone, wood, hemp concrete, FOB
on going project

Olympiades

Paris 13
Rénovation des tours Anvers et Londres
Metal cladding and plaster
Competition

Girondins

Lyon
Ensemble mixte logements et bureaux
Massive stone, wood, hemp concrete, FOB
on going project

Girondins

Description

50% of the housing units are co-designed and participative. The dominant material is stone (60% of facades), which is which is used in a variety of ways to support and enliven the and to support and enliven the volumes. Wood (30% of facades) will be used to emphasize the recessed façades and loggias. In addition, two small buildings made entirely of wood split the ring of buildings into two L-shaped stone buildings with skyline. In the heart of the block, the ground floor and first floor will be lime rendered over brick infill. All the materials have been chosen to create a warm, mineral atmosphere. Wooden joinery
contribute to the harmony of the whole.

Program

96 housing units and office space

Client

Grand Lyon Habitat

Team

ITAR Architectures
OTE
OTELIO
Marco Rossi Paysagiste
AIA Management
R-Use

Surface

6 718 m² SP housing
3 000 m² SP office